Anse-à-Valleau

Photo Album

Description

The Anse-à-Valleau wind farm is located in the town of Gaspé and entered operation in November 2007.

This wind farm, with a capacity of 100.5 MW and including 67 wind turbines, was the second wind farm developed by Cartier Wind Energy. It is primarily located on public land, but also includes a few wind turbines on private property.

Investments

Over the 20 years of Anse-à-Valleau wind farm operations, Cartier Wind Energy will pay the town of Gaspé over $2,710,500 based on the wind park’s installed capacity. Cartier will pay $1000 per megawatt (MW) installed at the time of the wind farm’s construction, and will continue to pay the same amount annually over the 20 years of the wind farm’s operation. These funds may be expended on areas within the town of Gaspé’s jurisdiction.

Furthermore, Cartier will provide a visibility fund of $27,500 to the town of Gaspé to assist local non-profit organizations.

Statistical summary

Total investment164 M $
Total installed capacity100,5 MW
Number of 1.5 MW wind turbines67
Wind turbine modelGE 1,5 sle
Total park area4 831 ha
Total investment in designated region (Gaspésie and Matane RMC) during construction102 M $
Average number of workers on site 100
Maximum number of workers on site325
Underground electrical system40 km
Number of permanent employees during park operation10
image
https://www.cartierenergie.com/wp-content/themes/blake/
https://www.cartierenergie.com/en//
#5485bd
style1
paged
Affichage en cours...
/home/cartierenergie/public_html/
#
on
none
loading
#
Sort Gallery
https://www.cartierenergie.com/wp-content/themes/blake
on
yes
yes
off
Enter your email here
on
off