Baie-des-Sables

Photo Album

Description

The Baie-des-Sables wind farm entered operation in November 2006. With a capacity of 109.5 MW, it was the first wind farm developed by Cartier Wind Energy.

Built entirely on private land, the 73-wind turbine farm was a success in terms of its construction, schedule compliance, integration and respect for communities.

It is located on land in the Baie-des-Sables and Métis-sur-Mer municipalities.

Investments

Over the 20 years of Baie-des-Sables wind farm operations, Cartier Wind Energy will pay the municipalities of Baie-des-Sables and Métis-sur-Mer $2,900,000. These voluntary contributions are based on the installed capacity of each municipality. Cartier will pay $1000 per megawatt (MW) installed at the time of the wind farm’s construction, and will continue to pay the same amount annually over the 20 years of the wind farm’s operation.

These funds may be expended on areas within the municipalities’ jurisdiction. Furthermore, Cartier will provide a visibility fund of $30,000 for the municipalities to assist local non-profit organizations.

Statistical Summary

Total investment164 M $
Total installed capacity109,5 MW
Number of 1.5 MW wind turbines73
Wind turbine modelGE 1,5 sle
Total park area5 200 ha
Total investment in designated region (Gaspésie and Matane RMC) during construction85 M $
Average number of workers on site150
Maximum number of workers on site325
Underground electrical system52 km
Number of permanent employees during park operation10
image
https://www.cartierenergie.com/wp-content/themes/blake/
https://www.cartierenergie.com/en//
#5485bd
style1
paged
Affichage en cours...
/home/cartierenergie/public_html/
#
on
none
loading
#
Sort Gallery
https://www.cartierenergie.com/wp-content/themes/blake
on
yes
yes
off
Enter your email here
on
off